No
|
Client & End User
|
Project
|
Manufacturer
|
Year
|
1
|
Damavand Petrochemical (Water Intake)
|
MOV & On/Off Valves for Damavand Petrochemical
|
Valvospain
|
2017
|
2
|
Mapna / Neyrperse - Esfahan Refinery
|
Cooling Water Pumps for Esfahan Refinery
|
TMP
|
2017
|
3
|
Mapna - Neyrperse
|
Spare parts of Kezeroon, Farab, Sanandaj & Damavand Power Plants
|
TMP
|
2017
|
4
|
Boushehr Petrochemical
|
Pipes, fittings, flanges, valves and gaskets for Boushehr Petrochemical
|
Shengli Oilfeild
|
2016
|
5
|
Damavand Petrochemical (Gas Station)
|
Piping Materials Shortage for Gas Station of Damavand Petrochemical
|
Raremetal Korea
|
2015
|
6
|
Payandan - IOOC
|
Sealing System for 1 Milion storage tanks of Lavan Iceland Project
|
CTS
|
2015
|
7
|
MAPNA - Neyrperse( Phase 14 )
|
Phase 14 Seawater Intake Pump
|
TMP
|
2015
|
8
|
MAPNA - Neyrperse - Sabalan Power Plant
|
Combined Cycle Power Palnt for Sabalan
|
TMP
|
2015
|
9
|
HTP-POGC ( Phase 13 )
|
South Pars Gas Field Deveopment/ 7' OD, seamless casing, L80 Type
|
Shengli Oilfeild
|
2013
|
10
|
HTP-POGC ( Phase 22-24)
|
South Pars Gas Field Deveopment/ 7' OD, seamless casing, L80 Type
|
Shengli Oilfeild
|
2013
|
11
|
HTP-POGC ( Phase 13 )
|
South Pars Gas Field Deveopment/ 9-5/8" OD, plus PUP- Joints/spare coupling
|
HG Tubilars
|
2013
|
12
|
HTP-POGC ( Phase 22-24 )
|
South Pars Gas Field Deveopment/ 9-5/8" OD, plus PUP- Joints/spare coupling
|
HG Tubilars
|
2013
|
13
|
HTP-POGC ( Phase 13)
|
South Pars Gas Field Deveopment/ 13-3/8 OD, plus PUP- Joints/spare coupling
|
HG Tubilars
|
2013
|
14
|
HTP-POGC ( Phase 22- 24)
|
South Pars Gas Field Deveopment/ 13-3/8 OD, plus PUP- Joints/spare coupling
|
HG Tubilars
|
2013
|
15
|
Power Control - IOOC
|
Sirri Water injection and treatment project/ service agreement
|
TMP
|
2012
|
16
|
Neyrperse - MAPNA
|
Kangan Combined Cycle Power Plant/ Fresh Cooling Water Pump
|
TMP
|
2011
|
17
|
SABA - IOOC
|
Centrifugal Pumps for Water Treatment & Injection Plant Sirri “C” & “D” Oil Fields Development Project
|
TMP
|
2007
|
18
|
KIPCO/ Sadra - POGC (Phase 13 )
|
South Pars Gas Field / Barred tee
|
EG
|
2012
|
19
|
KIPCO/ Sadra - POGC (Phas 22-24)
|
South Pars Gas Field / Barred tee
|
EG
|
2012
|
20
|
PKSK- POGC ( Phase 13 )
|
South Pars /Shortage slug catcher - pipe,fitting,flang
|
EG
|
2012
|
21
|
PKSK- POGC ( Phase 22-24)
|
South Pars /S hortage slug catcher - pipe,fitting,flang
|
EG
|
2012
|
22
|
AHAB - POGC
|
Pipes , Fittings, Flanges, insulating, joints, gasgets for South pars main power plant and for injection gas transmission of SP Phases (AHAB II)
|
EG
|
2010-2011
|
23
|
AHAB - POGC
|
Pipes , Fittings, Flanges, insulating, joints, gasgets for South pars main power plant and for injection gas transmission of SP Phases (AHAB III)
|
EG
|
2011
|
24
|
AHAB - POGC
|
Pipes , Fittings, Flanges, insulating, joints, gasgets for South pars main power plant and for injection gas transmission of SP Phases (AHAB I)
|
EG
|
2010
|
25
|
MAPNA MD3 - POGC
|
Pipes & large size fittings, gaskets,, insulation joints & spacers
|
EG
|
2009
|
26
|
Gachsaran Oil & Gas Production Co - NISOC
|
26” Gaskets, spacers, Neck and Refinery Flanges
|
EG
|
2009
|
27
|
Bandar Abbas Oil Refining Company - Bandar Abbas Oil Refining Company
|
Packing, Non Asbestos, Wire Reinforced for Bandar Abbas Oil Refining Company
|
EG
|
2008
|
28
|
Iran Ertebat Eng Co - NIGC
|
Large Size of Fitting & Bends for Second Phase of Second Sector Fifth Tehran , 48” Gas Transmition Pipeline from Parchin to Babai
|
EG
|
2007
|
29
|
Gas & Water Development Co. - Iranian Gas Engineering & Development Co. (IGEDC)
|
Large Size of Fitting and Hot Bends for 42” Gas Transmission Pipeline- North and Northeast Gas Pipeline Project
|
EG
|
2007
|
30
|
Gas & Water Development Co. - Iranian Gas Engineering & Development Co. (IGEDC)
|
Fittings for 30” Gas Transmission Pipeline Project From Dehgoan to Bijar
|
EG
|
2007
|
31
|
Iran Ertebat Eng Co - NIGC
|
Large Size Fitting & Hot Bends First phase of second sector of Fifth Tehran 56" Gas Transmission Pipeline from Kohsefid to Charmshahr
|
EG
|
2006
|
32
|
Sadid Jahan Sanat Co. - Karun Petrtochemical
|
Gaskets for Karun Petrochemical company (KRNPC)
|
EG
|
2005
|
33
|
Iran Razi Co. - Iranian Central Oil Field Company (ICOFC)
|
Pipes for Sarajeh Wellhead Facilities
|
EG
|
2004
|
34
|
Shahzand Arak Oil Refinery Co. - Shahzand Arak Oil Refinery Co.
|
Packing for Shahzand Arak Oil Refinery Co.
|
EG
|
2004
|
35
|
Sadid Jahan Sanat Co. - Tehran Oil Refinery
|
Piping construction and repairing activities of 500,000 bbl crud oil storage tank.
|
EG
|
2004
|
36
|
Faradast Energy Falat - PGSOC (Setare Naft Khalij Fars)
|
Bandar Abbas Gas Condensate Refinery EQ 273 - Motor Operated Valves
|
Arflu
|
2013
|
37
|
Faradast Energy Falat -PGSOC (Setare Naft Khalij Fars)
|
Bandar Abbas Gas Condensate Refinery EQ 268 - Motor Operated Valves
|
Arflu
|
2012
|
38
|
Nargan - NPC
|
Kordestan Petrochemical / Check Globe Gate,Ball
|
Arflu
|
2011
|
39
|
AHAB - POGC
|
Fuel Gas Supply Line to Assalouyeh Power Plant PH.2 - Ball Valves 2" - 20" class 600 (AHAB II)
|
Arflu
|
2011
|
40
|
Petropart - NIOPDC
|
Uroumiyeh Oil Depot. Manual valves, Gate,Ball, Check, Plug & butterfly Valves1/2" to 18" - different Class
|
Arflu
|
2011
|
41
|
Floskills - NIGC
|
Gas Reduction Station - Plug & Ball Valve
|
Arflu
|
2011
|
42
|
Floskills - NIGC
|
Gas Reduction Station - Plug & Ball Valve
|
Arflu
|
2011
|
43
|
Floskills - NIGC
|
Gas Reduction Station - Plug & Ball Valve
|
Arflu
|
2011
|
44
|
Nargan - NPC
|
Mahabad Petrochemical Manual Ball ,gate and on/off valves 1/2" to 24" - different Class
|
Arflu
|
2011
|
45
|
Nargan - NPC
|
Mahabad Petrochemical MOV Ball ,gate and on/off valves 1/2" to 24" - different Class
|
Arflu
|
2011
|
46
|
Petropart - Damavand Petrochemical
|
Main fuel and feed for PH.2 Assalouyeh- Ball & Globe valves and check valves 1/2" to 40" - in different Class
|
Arflu
|
2010
|
47
|
AHAB - POGC
|
Fuel Gas Supply Line to Assalouyeh Power Plant- Ball + Plug + Glob Valves 1"to 20" - class300- 600 ( AHAB 1)
|
Arflu
|
2010
|
48
|
Sadaf Institute - NIOPDC
|
Manual and MOV Plug ,Gate,globe,check, butterfly valves 3/4" to 24" in different class for Mahshahr Oil Depot
|
Arflu
|
2010
|
49
|
GSOGPC(Gachsaran oil and Gas Production Company)- NISOC
|
Gachsaran - Ball valves ( Mov & manual)
|
Arflu
|
2009
|
50
|
Mapna MD3 - POGC
|
Ball Valves(20”- class 600) , Check Valves(20”- class 600) Plug Valves(4”-class 600) for South Pars Field Static Power Plant Gas pipeline
|
Arflu
|
2009
|
51
|
Petropart - NIOPDC
|
Uroumiyeh Oil Tank farm- MOV Plug Valves 6" to 20"- class 150
|
Arflu
|
2009
|
52
|
Petropart - NIOEC
|
Sari Moghanak, Ball, Check & Butterfly valves-,6" to 36" - class 150
|
Arflu
|
2009
|
53
|
Mapna Boiler - NPC
|
Fajr II Petrochemical, Ball,gate,Globe Check valves 1/2" to 30" in different class
|
Arflu
|
2009
|
54
|
GSOGPC(Gachsaran oil and Gas Production Company) - NISOC
|
Gachsaran- Ball valves 6" to 24" in different class
|
Arflu
|
2008
|
55
|
Arya Petro Gas Global - NIOPDC
|
Plug Valves(6”,8”,12” & 14”- class 150) for Birjand Tank Oil Farm Project
|
Arflu
|
2008
|
56
|
West Azarbayjan Gas Company - NIGC
|
Ball valves 8" to 30" in different class
|
Arflu
|
2008
|
57
|
Technican Company - NIOPDC
|
Mov Plug valves 8" to 16" -class 150 use in Oil Tank Farm for 5 Cities
|
Arflu
|
2008
|
58
|
Kherad Energy Enviroment Company - NPC
|
Ball valves 1/2" to 20" in different class for Fajr 2 Petrochemical
|
Arflu
|
2008
|
59
|
Gachsaran Oil & Gas Production Company - NISOC
|
Ball Valves - 26"- class 1500 for Gachsaran Oil & Gas
|
Arflu
|
2007
|
60
|
Pars Red Star - NISOC
|
Ball Valves(8” & 12” class 300) for one of NISOC’s projects
|
Arflu
|
2007
|
61
|
Honameh Co. - Tous Power Plant
|
Ball Valves(16’’- class 300) for Tous Power Plant
|
Arflu
|
2007
|
62
|
Gharargah Sazandegi Khatam Al-Anbiya (GSKA) - Iranian Gas Engineering & Development Company
|
Enginering System of IGAT7 Gas Transmission for Pipes, Flanges, fittings and gaskates,Valves & etc. - No Supply
|
EG/Arflu
|
2006
|
63
|
SABA - Kharg Petrochemical Company
|
Expansion Berthing Facilitiesof Kharg Island - Ball,Gate,check & Butterfly Valves 3/4" to 42" in different classes
|
Arflu
|
2006
|
64
|
IOOC
|
Globe Valves(6”- class 1500) for Bahregan Project
|
Arflu
|
2006
|
65
|
Jalkeh - NIOPDC
|
Valves for Darreh Shahr Oil Storage Farm gate ,check ,butter fly and plug1/2" to 16" in different class
|
Arflu
|
2006
|
66
|
Mapna - Ministry of Energy
|
Ball valves for Tous Gas Power Plant (1/2"- 20") class 600 - 800
|
Arflu
|
2006
|
67
|
Jalkeh - Oil Export Terminal Company
|
Kharg Oil Export Terminal Floating Roof Oil Tanks -mov 20"to 36" class150
|
Arflu
|
2006
|
68
|
Azarab Energy Co. - Banias Refinery, Syria
|
Valves for Syria Banias power plant,check ,Globe,Gate,Butterfly valves 4" to 18"
|
Arflu
|
2005
|
69
|
Shazand Arak Oil Refinery - Shazand Arak Oil Refinery
|
Gate Valves for Refinery Expansion and Product Upgrading gate valves 8"
|
Arflu
|
2005
|
70
|
SABA - Lavan Refinery
|
Ball Valves for Lavan Crude oil Export Pump Station Bull 10"- class 150, 300
|
Arflu
|
2005
|
71
|
Rasis Afzar - Irainian Petrochemical Co.
|
Gate Valves(4”, 6” & 20”- class 150)
|
Arflu
|
2004
|
72
|
Jondi Shapour Co. - IOOC
|
Bahregan Crude Oil Tank with 1,000,000/ Shoe Seal ,Secondry roller seal
|
BTE
|
2012
|
73
|
SEPCO - South Pars Energy Pars(POGC)
|
BTE Drain System/Shoe seal ,secondry roller system
|
BTE
|
2012
|
74
|
EMMC - Lorestan Petrochemical Complex
|
Lorestan & Mahabad / Shoe Seal Petrochemical
|
BTE
|
2011
|
75
|
Setin Sanat Espadan - IOOC
|
Bahregan by Two 5000,000 Barrel Oil Tank / Shoe Seal ,Drain System
|
BTE
|
2011
|
76
|
Mehvar Talaee
|
Shahid Rajaee /mechanical Seal/ Drain / Shoe Seal ,Secondry Roller Seal
|
BTE
|
2011
|
77
|
Parsian - NPC ( Damavand Petrochemical Cooperation)
|
Damavand Steam Generation and Power Plant Suction Line
|
BTE
|
2011
|
78
|
Loole Peygostar- IOOC
|
Bahregan Crude Oil Tank with 1,000,000/ Shoe Seal ,Secondry roller seal
|
BTE
|
2011
|
79
|
Shahid Rajaie - POGC
|
Sealing & Roof Drain Systems to suit 4 HC Condensate Storage Tanks in Phases 15 & 16, 9 & 10, 22-24 Assaluyeh Tanks
|
BTE
|
2011
|
80
|
Rampco - NIOPDC
|
Kerman Tank Farm- Construction and equipping tank farm
|
BTE
|
2011
|
81
|
Shahid Rajaie Institute - NIOPDC
|
Bahonar (Bandar Abbas) & Nezamieh (Ahwaz) Tank Farms – Shahid Shooshtari
|
BTE
|
2011
|
82
|
Looleh PayGostar Co. - IOOC
|
Construction of new 1 x 1m BBL floating roof storage tanks in Bahregan zone
|
BTE
|
2011
|
83
|
Setin Sanat Setiran Co - IOOC
|
Construction of new 2 x 500,000 BBL floating roof storage tanks in Bahregan zone.
|
BTE
|
2011
|
84
|
Looleh PayGostar Co. - IOOC
|
Replacement of damaged seals by thunder 1 x 61m Storage Tank on Qeshm Island
|
BTE
|
2011
|
85
|
Parsian Power Co. - Mapna
|
Construction of 2 x Gasoil Storage tanks in Genaveh Power Plant.
|
BTE
|
2011
|
86
|
Farab Co. - Mapna
|
Construction of 5 x Gasoil tanks in Dalahoo & Yazd Power Plants
|
BTE
|
2011
|
87
|
Golden Line Co - Golden Line Co
|
Construction of 6 x 18m & 24m floating roof Storage tanks in Bandar Abbas
|
BTE
|
2011
|
88
|
Novin Energy Co. - Mapna
|
Construction of 3 x Gasoil tanks in Fars Power Plant.
|
BTE
|
2011
|
89
|
Parsian - Isfahan Power Plant
|
Isfahan II Combined Cycle Power Plant / Swing Master Joint
|
BTE
|
2010
|
90
|
Pishgaman Fan Andish Co. - NIOPDC
|
Construction of new floating roof and internal floating roof storage tanks in the newly-built Malayer tank farm.
|
BTE
|
2010
|
91
|
Esfahan Machinary
|
|
BTE
|
2010
|
92
|
EMMC - Lorestan Petrochemical Complex
|
Construction of 2 x 45m floating roof Storage tanks in Lorestan Petrochemical complex
|
BTE
|
2010
|
93
|
Parsian Power Co. - Mapna
|
Construction of 2 x Gasoil Storage tanks in South Isfahan Power Plant.
|
BTE
|
2010
|
94
|
Rahbord Sazeh Co - Mapna
|
Construction of 1 x Gasoil Storage tanks in Rey Power Plant
|
BTE
|
2010
|
95
|
Sadaf Institute - NIOPDC
|
Construction of new floating roof storage tanks in the Mahshar tank farm.
|
BTE
|
2010
|
96
|
Rojin Sanat - POGC
|
Construction of 4 x 42m floating roof condensate Storage tanks in SP phases 17 & 18
|
BTE
|
2009
|
97
|
Hormoz Energy Co. - Shahid Rajaie
|
Sealing & Roof Drain Systems to suit Shahid Rajaie Port Tanks
|
BTE
|
2009
|
98
|
Meam Team Co. - NIOEC
|
Sealing Roof Drain Systems to suit Shiraz Refinery Tanks
|
BTE
|
2009
|
99
|
Kherad Co. - Mapna
|
2 x 16” Suction Lines to suit Fajr Power Plant Tanks
|
BTE
|
2009
|
100
|
Design & Inspection Co. - Khoy power Plant
|
2 x 12” CS Suction Lines for construction of 2 fuel tanks in Khoy Power Plant
|
BTE
|
2009
|
101
|
Jahan Kar Esfahan - Electricity Development Department
|
1x12” CS Suction Line + 1xBTE Level Indicator + 1xFloat Type Level Indicator for construction of one fuel storage tank in Sanandaj Power Plant
|
BTE
|
2008
|
102
|
Design & Inspection Co. - Bandar Abbas Oil Refining Company
|
11xSS Multi Suction Lines for Bandar Abbas Oil Refining Company Expansion Project
|
BTE
|
2008
|
103
|
Jondi Shapour Co. - NIOPDC
|
Sealing & Roof Drain Systems + 2xAIFRs and 2x10” SS Suction Lines for NIOPDC ‘s Mashhad & Isfahan Tank Farms project
|
BTE
|
2008
|
104
|
PIDEC - Abadan Refinery
|
Primary Sealing Systems for Abadan Refinery phase 3 renovation project
|
BTE
|
2008
|
105
|
MSA(Mashine Sazi Arak) - Abadan Refinery
|
4 x 10” SS Suction Lines for Abadan Refinery
|
BTE
|
2008
|
106
|
Paydar Poulad Pishro - NIOC & IOOC
|
Sealing & Roof Drain System for Shiraz Refinery & Qeshm Production Unit
|
BTE
|
2008
|
107
|
Design & Inspection Co. - Bandar Abbas Refinery
|
7 x various size SS Suction Lines to suit Bandar Abbas Refinery Tanks
|
BTE
|
2008
|
108
|
IBC - NIOPDC
|
Sealing & Roof Drain System for 20 tanks of NIOPDC’s Five Cities Ahwaz-Arak-Esfahan- Sari-Torbat
|
BTE
|
2007
|
109
|
Moshanir - Mapna
|
Suction Line System for Jahrom Power Plant
|
BTE
|
2007
|
110
|
Petropart - Mapna
|
Sealing products- Toos Power Plant Expansion Project
|
BTE
|
2006
|
111
|
Jalkeh - Oil Export Terminal Company
|
Kharg Oil Export Terminal Floating Roof Oil Tanks
|
BTE
|
2006
|
112
|
Zalvand - Zalvand
|
Sealing & Drain Systems of Zalpars Storage Tank - Construction of 1 floating roof storage tank in Mashhad
|
BTE
|
2006
|
113
|
Shahid Rajaie - NIOPDC
|
Sealing And Drain Systems for Isfahan & Ghazvin Tank Farms
|
BTE
|
2006
|
114
|
Aronab - Mapna
|
18” Swing Master Joint for Kerman Power Plant
|
BTE
|
2006
|
115
|
Kherad Water Treatment Co.- Mapna
|
1 x 16” SwingMaster Joint to suit Kazeroun Power Plant Tank
|
BTE
|
2006
|
116
|
Shahid Rajaei - GSK
|
Assaluyeh Phases 9 & 10
|
BTE
|
2006
|
117
|
Petro Part - Mapna
|
Toos Power Plant - Suction Line System
|
BTE
|
2006
|
118
|
Super Active Co.- Kermanshah Refinery
|
Sealing & Drain systems for crude oil storage tank for Kermanshah Refinery
|
BTE
|
2005
|
119
|
Kherad Water Treatment Co. - Mapna
|
Suction Line Systems and Swing Master Joints for Shirvan Power Plant
|
BTE
|
2005
|
120
|
SABA - N.I.O.P.D.C.
|
Sealing & Drain systems for Tank Farms of Zahedan & Rafsanjan Oil Reservoir
|
BTE
|
2005
|
121
|
SABA - Kharg PC
|
Sealing & Drain Systems of Kharg Petrochemical Complex
|
BTE
|
2005
|
122
|
Azarab Energy Co. - N.I.O.P.D.C.
|
Sealing, Drain and Suction Line System for Chabahar Tank Farm
|
BTE
|
2005
|
123
|
Kherad Water Treatment co. - Mapna
|
Swing Master Joint for Damavand Power Plant Expansion
|
BTE
|
2005
|
124
|
Sadid Jahan Sanat Co. - Tehran Refinery
|
Sealing & Drain Systems for Tehran Refinery
|
BTE
|
2004
|
125
|
Pars Kayhan Co.- Mapna
|
Suction Line for Gasoline Storage Tank of Sanandaj Power Plant
|
BTE
|
2004
|
126
|
Kherad Water Treatment Co. - Mapna
|
Swing Master Joint for South Isfahan Power Plant
|
BTE
|
2004
|
127
|
Kherad Water Treatment Co. - Mapna
|
Swing Master Joint for Kazeroon Power Plant
|
BTE
|
2004
|
128
|
Neyrperse - Isfahan Refinery
|
Sealing & Drain Systems for Isfahan Refinery
|
BTE
|
2004
|
129
|
Tasha - Sazeh
|
Sealing & Drain Systems for 1-Hexane Storage Tank in Assaluyeh
|
BTE
|
2004
|
130
|
ICOFC - Namvaran Enginering Company
|
Sealing & Drain Systems for Cheshmeh Khosh Roof Tank - Construction of 1 floating roof tank
|
BTE
|
2004
|
131
|
Shell Exploration Company - IOOC
|
Soroush Floating Storage Unit
|
Peter Brother Hood
|
2001
|
132
|
SINOPEC Engineering Incorporation - SAZEH Consulting Engineers
|
Shazand Arak Upgrading and Expansion Project
|
Peter Brother Hood
|
2006
|